Bracket/Cantilever adjustment is crucial for the smooth operation of the electric engine’s Pantograph.
The parameters for bracket adjustment are vary project wise or client demand. We are explaining about bracket adjustment work in OHE on the basis of practical method.
There are two types of bracket/cantilever adjustment
Note- This Article is under progress, full details will be public on or before 10th November 2024
Normally, the encumbrance is 1.4 meters and contact & catenary height depend upon project/client demand.
Let us consider, we want 5.6 meters contact height. Then height of catenary wire will be 7.00 meters with 1.4 meters encumbrance. Where contact height is required 5.8 meters, catenary height will kept at 7.2 meters.
Stigger
Note:- a) Catenary stigger is kept zero in IR(EPC) project, While in DFCCIL project it remains dead-plumb with contact.
b)Keep the stigger as per given value in SED.
As discussed in the article no 5 that distance between starting point of the next shot & termination of previous shot is called Overlap-zone.
On the basis of insulation, overlap is two types.
On the basis of span, Overlap-zone are 2 types
In case of uninsulated overall, the horizontal gap between IR and OR is kept 200. Rest of the procedure is to be followed as shown in the picture
The height and strigger of IR and OR wire at these four points is kept as per the given chart.
Sr. No Point A, B, C, D
Height of IR
Strigger of IR
Height of OR
Strigger of OR
Horizontal gap between IR & OR
In case of uninsulated overall, the horizontal gap between IR and OR is kept 200. Rest of the procedure is to be followed as shown in the picture
a) The starting point of the next shot is shown at point “a”.
b) At point “b” the IR wire of the previous shot and the OOR wire of the next shot are shown.
b2) At point “b2” the IR2 wire of the previous shot and the IR1 wire of the next shot are shown.
c) At point “c” the OR wire of the previous shot and the IR wire of the next shot are shown.
d) The termination of previous shot is shown at point “D”.
The height and strigger of IR and OR wire at these four points is kept as per the given chart.
Sr. No Point A, B, C, D
Height of IR
Strigger of IR
Height of OR
Strigger of OR
Horizontal gap between IR & OR
In case of insulated overall, the horizontal gap between IR & OR is Kept 500mm. Rest of procedure is to be followed as shown in the figure-1&2 chart-1
ii) insulated overall adjustment in 3 span condition:
ii) insulated overall adjustment in 4 span condition:-
In case of box type of cantilever adjustment, the encumbrance and stigger should be .90 meters and 0 respectively.
Contact height and Top & bottom height is depend upon project/client demand.
In case of cross over, the following points must be apply
Let us consider, permissible height of the contact wire is 5.6 meters in any project & main line have +100 stigger with 350 mm track-separation (TS).
Then, the following parameters should be apply at site.
Do you know about super elevation in railway track? it not, let us tell you.
If outer edge/rail of the railway track is rotated with respect to inner edge/rail, it is called as super elevation. For more details information about super elevation click on this link.
Now let us know how to do bracket adjustment in super elevation.
Let us consider, super elevation is 100 mm on site and we want +200 stigger & 5.6 meters contact height with 1.4 meters encumbrance.
Formula, distance of replacement on gage = (Contact height/Gage length)x SE
DR = (5.6/1.67)X100
= 335 mm