Site icon Vima Info

Grouting work in OHE

Casting a mast with proper alignment in the OHE foundation is called grouting process. Grouting is an important and careful process. Once grouting is done incorrectly, it cannot be easily corrected. Therefore, it is essential to keep the following points in mind before carrying out the grouting work.

  1. Type of Mast & it’s Implantation
  2. Embedment Length
  3. Part of mast below & above the Rail level
  4. Reverse Deflection
GROUTING WORK IN OHE

Type of Mast & it’s Implantation

Before grouting work, Ensure that you determine/check the type of mast from CSD; otherwise, once grouting is done, the mast may either get damaged or both the mast and OHE foundation could be useless.

Embedment Length

Embedment length is the length of mast which is inserted into the OHE foundation. Before mast erection, ensure that embedment length is sufficient for grouting work.

Portion of mast below/Above the rail level

At the time of mast alignment, we must ensure that the required length of mast is above the rail level(7.65 meters) or required length of mast is below the rail level(1.85 meters in IR).

Portion of mast above the rail level = Mast Length – (Step Distance + Embedment Length)

                                       ML = L – (SD + EL)

L= 9.5 meters in IR, 9.8 meters in DFCCIL project

SD = 0.50 meter in IR, 0.80 meter in DFCCIL Project

EL = 1.35 m for normal mast, 1.45 m for Portal Upright

Reverse Deflection

The bending of OHE mast from its vertical position is called reverse deflection. Generally reverse deflection value are 0, 30 & 60.

Actually OHE mast should be straight without any deflection after the erection of final load such as brackets, boom & wires. This is the reason we provide reverse deflection in the OHE Mast. If we don’t provide reverse deflection, OHE Mast will lean after erection of brackets, wires & others load.

(it means mast will bend towards the track center)

(it means mast will bend opposite direction of the track centre)

How to check revers deflection practically

Following materials will required for Alignment & deflection checking of OHE Mast-

1)Wooden or Angles , 2) Plumb bob with thread,  3) Scale or Vernier Callipers, 4) Twist rotator(mostly BT or ST pipe are used)

Following procedure will do for deflection checking-

Now, we will calculate the value of X.

Length of mast (L) = 9.5 meters

Length of mast above the foundation level

FL = L – EL

FL = 9.5 – 1.35

FL = 8.15 meters

Deflection (D) = 30 mm or 0.03 meter

Let us consider X mm deflection required for 1.5 meters of plumb.

If value of deflection is 0.03 meter for 8.15 meters of mast

Then value of deflection for 1 meters = 0.00368 meters

So, value of deflection for 1.4 meters of plumb = 0.0051 meter or 5 mm.

            Value of X = 5 mm

That’s why, as per plumb image we can check 30 mm gap between face of the mast & centre point of plumb ball.

X+25 mm = 5 mm + 25 mm = 30 mm

Sr. No Length of Plumb Value of X
1 1.3 m 4.7mm ~ 5mm
2 *1.4 m 5.1mm ~ 5mm
3 1.5 m 5.5mm ~ 5 mm
4 1.6 m 5.8mm ~ 6mm
5 1.7 m 6.2mm ~ 6 mm

 

 

 

Exit mobile version